Summer 2005. EA was contracted for clean-up duty. The client had an existing system which was dysfunctional due to improper design. Flaws identified:

• A 30 kW generator with under 1 kW of charging capacity
• Excessively large battery bank, would take over 100 hrs of generator running to charge
• Batteries of many different ages and conditions all tied together
• Numerous safety issues relating to battery cabling.

Upgrade:

• Dual Xantrex SWPlus5548 inverters on a power panel
• 80 kWh battery bank, industrial 2V cells
• Generator automation
• 0.8 kW PV array
• Custom designed winter heating system for generator

This installation was in conjunction with Randy Rodgers, or Rogers Electric in Smithers, BC.




Contact Energy Alternatives - (250) 846-9888 • Smithers, British Columbia Canada V0J 2X2
© Copyright 2013 EA Energy Alternatives Ltd.
Design & Resources - Articles, Troubleshooting, Education, FAQ's, System Design, Design Tools, Conservation, Catalogue Download.
Company - Installations, About EA, Testimonials, Privacy Statement, Homepage s
Catalogue - Systems, Photovoltaics, Wind, Microhydro, Inverters, Batteries, Battery Chargers, Balance of Systems, Pumps, Generators, Books & Education